Phase 3 Water Conveyance
A nine-tank program delivered through continuous slipform operations for elevated water infrastructure.
Selected projects
Explore selected slipform construction and heavy lifting projects across Egypt and Saudi Arabia.
A nine-tank program delivered through continuous slipform operations for elevated water infrastructure.
Slipform construction of two elevated water tank shafts, each 30 m high, with a 5.20 × 5.20 m footprint, a 1.70 m internal diameter and 25 cm walls.
Completed the heavy lifting of six elevated water tanks in Hail, Saudi Arabia, each with a capacity of 600 m³.
Construction and slipform works for two ground water tanks.
Slipform construction of tanks for a plant designed to supply Nasr City and New Cairo with 500,000 m³ of potable water per day.
Construction and slipform works for four minarets, each 57 m high, in Egypt’s New Administrative Capital.
Slipform works completed in 2004 by the technical team now working with Avalon Slipform.